dang I remember being on 12's that was a fkn schedule and a half on 8's for right now from 630 to 3. oh and I'm bored as s**t too lol. workin with our power co.
part of my research is to write up a new recyclin plan for the schools out here, liek an actual policy they can follow but you cant start s**t liek that without doing the basics like throwing the right s**t in the right dumpster (ie yard waste, polystyrene, cardboard) so I have been inspecting dumpsters at each school makign sure they have the garbage 101 basics down....surprise surprise they DONT half the schools dont break their cardboard boxes down. they waste sooo much bin space and then b***h about the garbages over flowing...i mean wtf?!?!
ps the stapler is in my bag ready to make the trip home with me
sounds different, I know what ya mean on the dumpsters we lose alot of space offices just throw furniture boxes in there, cmon man I'm not takin em out and doin it myself jeeze. how long you been doin this kind of research and what not?
side note: damn fax is giving me hell again won't send my stuff
its a summer thing 9 weeks im doign the recylign stuff and also im looking into the fesability of installing a geothermal hvac system on one of the junior highs out here. but im on a week break from that because chevron energy coordinators are out of town...so im bored as s**t in my office creeping on 7thgenhonda.com and club civic...what do you do
I work at a power plant down here doing alot of gopher work lol set up orders, pick up orders, just the usual office stuff really nothing all exciting most of the time its a waiting game with alot of paper work, alot of things I can't really talk about...funny. they moniter what you do lol hell they could be reading this. I dunno its hard to explain my job to be honest with ya. was on a golf course before this for 5 1/2 yrs.
i do have a real job but i finished most of my research in the first few weeks...s**t im already prejecting and energy cost savings of about 45% of what they are paying provided they install this geo system..
My shift just started, 6-3, usually around 11 it starts to get boring but then at 12 go to lunch, come back at 1, and it's just 2 hrs to go.
What do I do? import/export Toyota parts to make the Tacomas in the factory that we have in Tijuana, Mexico.
my shift started last night around 10pm and ended about 4am this morning. Just put it like this, some poor guy probably got home from work this morning to find his door locks changed and his windows boarded shut. not to mention his ford escort and ford tempo in the middle of the street if they haven't been towed yet. this is beyond the point of eviction tho