Sorry everyone, I'm lazy lol oh well and I'm not done with the project yet.
Intake Manifold!!
There were wooden 2x4 in the seams, stupid. So we're gonna fill em up.
Tiles are up.
Spa actually has twice as many jets.
Deck guys f'd up. Everything in the step down deck was suppose to be stamped. They were too slow. Wasted a lot of money on it. Main guy flew back down to LA. I'm going to sue him
My water slide! Cost as much as a hatchback lol.
Bricks for my fence.
Front yard.
Damages for the step down deck, lazy to explain everything that was messed up.
Step was too high so I jack'd most of it.
Repairs, tiles are freaking expensive so ima just pour over everything.
West deck, it was suppose to be poured on Tuesday, July 17th! They didn't have any trucks available so it won't be poured till Saturday, July 21st.
Ahhh Photobucket is having site difficulties. I'll upload the rest some other time and no the pool and fence are not done yet.
Oh and the purpose of the step down deck is so you could be eye level with the swimmers in the pool. There will be a sink + BBQ set, and fire place table down there. I have pics of em but you're going to have to wait.