Well got school money in and was not the amount i was planning so car is probably going to be down for a while longer until fall semester in august.
get the kteller one... its super nice.got two tires waiting to be put on one will need to be patched when i get around to it. Beside that now it's back to final parts. I am needing some opinions on a few things. I just feel like an idiot if I am posting on here and having no one read it though. One of my main thins is going 3in exhaust i'm undecided on the kteller weld up kit or this kit. http://www.mandrel-bends.com/catalog/reviews/3-0-exhaust-1996-2000-honda-civic-pipe-kit-aluminized-812/?osCsid=f95ed9882f5584db635375ed0b0f6286 The problem with that kit is that I see no reviews about them on parts. I also need to buy a piece of intercooler piping or have one made but not sure where to get that done at. I was thinking possibly at an exhaust shop but unsure if they would have aluminum piping. As soon as I get 3in i plan on having it welded up and getting a custom exhaust coming off of waste gate back into my exhaust. Now back to my 3 in exhaust since I will be getting either kit I'm sort of debating on having a flex pipe or not. If i get one who should i get one from. The last things on my list deal with oil catch can. I have been looking and plan on going with a baffled oil catch can and then my custom setup on valve cover venting which mymmery i may be hitting you up soon possibly on what we talked about. I also have big plans for painting my valve cover as well. The other parts I need are minor (bumper, fenders, 13in rims, slicks) Okay please let the comments start flowing will post up link on catch cans i have been looking at soon. One is by mishimoto the other is some strange company i have never heard of.
Well not to much of an update but I have my go auto works catch can in. Have found someone to do my valve cover welding as well. All that is left is new tires, bumper, some exhaust work, and tune which I have already been talking to tuner to get it done. Now its just a matter of getting time to do everything and how i plan on getting some of the work done.